Overhauling of the bow rudder unit of the ferry “Mecklenburg-Vorpommern”
In the time from 26.12.2013 to 06.01.2014 MET GmbH carried out the entire overhauling of the hydraulic cylinder bearing of the bow rudder unit of the Stena Line GmbH & Co. KG ferry “Mecklenburg-Vorpommern”. Due to bow rudder failures shortly after commissioning of the ship MET GmbH developed in the year 2000 a design solution…
Read more